Resource · Facilities management

FM Handover: What to Ask For in a pin360 Share Link

At practical completion, FM teams inherit defects lists, O&M manuals, and drawing registers — but rarely a navigable photographic baseline. A pin360 handover link turns the floor plan into the index for 360° condition evidence.

Handover checklist (copy for contractors)

  • Building name, address, and handover date in the project title
  • Current-revision floor plan PDFs (all relevant levels)
  • 360° panoramas at plant rooms, roofs, and key circulation areas
  • Severity pins for snags, defects, or outstanding compliance items
  • Written notes at critical pins (asset ID references where applicable)
  • View-only share link — no login required for FM reviewers
  • Optional: exported inspection report PDF/DOCX for the O&M file

What the FM team sees

Opening the share link shows the building floor plan. Click any pin to open the 360° view or defect record from that location. No pin360 account is required — suitable for helpdesk staff, contractors, and auditors.

Use it for onboarding new FM staff ("where is the AHU?" → click the plant room pin), baseline condition before the defects liability period ends, and evidence when raising CAFM work orders.

CAFM next step

Paste the pin360 URL into your CAFM building record, compliance file, or work order as the spatial photo appendix. pin360 does not replace your asset register — it reduces "which photo was that?" friction when reactive jobs arrive.

CAFM integration patterns (link + optional embed) →

FM industry page

Workflows for inspections and compliance walks.

Golden thread guide

What pin360 is and isn't for compliance teams.

Surveyors: deliver handover-ready links

Pin evidence on the drawing, share one link, export the report.

Start free